Dam Construction in Kenya

Dam Excavation

+254 728 163329 WhatsApp +254 724 775516

Dam excavation decides how much water a farm can hold for the rest of the project. Dig the basin wrong and the liner, the spillway, the outlet and the pump are all built around too little storage.

Kenyan farms build dams for irrigation, livestock, horticulture and greenhouse water. A dam stores what the catchment above it delivers. Therefore the basin has to be sized against a poor rainfall year, and not only an average one.

At Eunidrip Irrigation Systems we treat dam excavation and site preparation as one job. The lining, the spillway and the irrigation that follows are part of the same plan. This page covers the ground work itself. It covers what the work involves, how much soil has to move, and which machine suits the site. The wider build sequence, covering survey, construction and handover, sits on our irrigation reservoir construction page.

What Dam Excavation Actually Covers

Dam excavation forms a basin, its slopes and its embankment.

A complete excavation contract normally carries these items.

  • Setting out from the surveyed design
  • Topsoil stripping and stockpiling
  • Bulk excavation down to the basin levels
  • Cutting the side slopes to the designed batter
  • Base preparation and compaction
  • Placing and compacting fill for embankments
  • Hauling away spoil that cannot be used
  • Levelling the basin floor and handing over for lining

Setting out matters more than it looks. The design is transferred onto the ground with pegs and a laser. Then a bucket touches the soil. The finished basin matches the design that was costed and approved.

Three items sit outside the excavation scope. They are the liner and its underlay, the spillway and outlet structures, and the pump set. A quotation that looks cheap usually differs in one of those places. Compaction is also part of the dig and not an extra. Fill placed in thin layers and compacted is what stops an embankment settling in the first rainy season.

Dam excavation basin lined with black HDPE geomembrane, with excavated rock spoil in the foreground
The excavated basin after lining, with the rock spoil from the dig in the foreground.

How Much Soil Dam Excavation Has to Move

Storage comes before the dig.

Take a 20 by 30 metre footprint, 2 metres deep at the base. Add side slopes of one vertical to two horizontal. Each side then cuts back 4 metres at the surface. The opening at the top is 28 by 38 metres.

The average of the two areas is 832 square metres. Multiply that by the 2 metre depth. The basin then holds about 1,664 cubic metres, which is 1,664,000 litres.

Depth at the baseSurface openingExcavated volumeStored water
1.0 metre24 by 34 metres708 cubic metres708,000 litres
1.5 metres26 by 36 metres1,152 cubic metres1,152,000 litres
2.0 metres28 by 38 metres1,664 cubic metres1,664,000 litres
2.5 metres30 by 40 metres2,250 cubic metres2,250,000 litres

The same 20 by 30 metre footprint at four depths, with side slopes of one vertical to two horizontal.

The table shows the part that surprises people. Going from 1.5 metres to 2 metres of depth adds 44 percent more water. It also adds 145 percent more soil, because the slopes take the extra depth as well as the floor.

The dig is also bigger than the hole. Bank soil swells by about a quarter when it is broken out. Then 1,664 cubic metres of bank becomes roughly 2,080 cubic metres of loose spoil. That spoil has to be moved, tipped and compacted.

Also, the storage is never entirely full. At 2 metres, the water surface sits at about 1,064 square metres. Every millimetre of evaporation takes 1,064 litres out of the reserve. On this basin, a hot spell costs thousands of litres before the crop sees any water.

Demand sets the target volume. One acre of maize at 5 millimetres a day needs about 20 cubic metres of water. The basin above therefore carries roughly 80 days of irrigation for that acre.

FAO 56 sets out how crop water demand is worked from reference evapotranspiration. A crop coefficient turns that into a daily figure. The same method sizes the reservoir that has to supply it.

What the storage is forVolume neededBasin at a 2 metre depth
One acre of maize, 80 days1,600 cubic metres1,664 cubic metres
One acre of maize, 120 days2,400 cubic metres2,250 cubic metres at 2.5 metres
Drip on 2 acres, 60 days2,400 cubic metres2,250 cubic metres at 2.5 metres

Storage demand set against the volumes above, before any allowance for evaporation and residue.

Four Ways Dam Excavation Is Done

The method follows the scale of the work and the ground under it.

MethodHow the soil movesWhere it worksWhere it stops working
Hand excavationSpades, hoes and barrowsVery small pans, tight cornersDepth control and rate both fall away past a few hundred cubic metres
Animal-drawnPlough, scoop and a drawn cartShallow rural pans on soft groundNo reach, no compaction control, no side slope shaping
Tractor and trailerLoader or scraper, tipping trailer, graderSmall and medium farm dams on soft soilCannot bench or cut a deep slope, and stalls in wet ground
Excavator and bulldozerCrawler excavator, dozer, compactor, tipperMedium and large dams, and any site with rockNeeds access for the machine and a way to move spoil off site

The four excavation methods, and the point at which each one runs out of road.

For a modern farm dam, machinery is normal where the volume and access justify it. However, the method that suits a contractor is not the method that suits a small holder. The cost difference between them is mostly the cost of moving and compacting soil.

A practical split sits around 500 cubic metres. Below that, a tractor and trailer can hold the schedule on soft ground. Above it, a crawler excavator with a dozer and compactor shapes the slopes. That combination also places the fill and finishes a base that will hold water.

Choosing the Machine for Your Dam Excavation Site

Four questions settle which plant goes on the site.

  • How much soil, which sets the machine size and the number of shifts
  • How hard the ground is, which decides between a breaker, a ripper and a rock drill
  • How narrow the access is, which decides between a tracked and a wheeled machine
  • Where the spoil goes, which decides the number of tipper trips

Tracked machines work where wheeled machines cannot. A crawler excavator sits on soft ground, cuts a stable slope and places fill accurately. It can also work a slope face that a loader cannot reach without tipping over.

Access is the usual reason a price moves. A low-loader with a tracked machine needs a firm route in. If the last 200 metres is soft or narrow, the machine arrives on a chain of smaller vehicles. Then the work slows and the mobilisation line grows.

Next comes the ground itself. Rock has to be broken before it can be loaded. Broken rock then has to be shaped into a slope that will stand. Meanwhile, a water table close to the surface fills the hole as fast as it is dug. The floor will not compact while it is wet.

Finally, timing matters. Working in the dry season costs less per cubic metre. The plant then works at full capacity and the fill compacts properly. In practice, the same basin dug in the short dry season costs less. The same basin dug across the long rains costs more.

What Drives the Price of Dam Excavation

In practice, price is volume times a rate, and the ground sets the rate.

Every contractor prices dam excavation from the same list of drivers. The quantity comes off the survey. The site then decides what each cubic metre costs.

DriverWhat the contractor checksWhat it does to the bill
Excavated volumeCubic metres in bankThe base quantity that every other line is measured against
Soil typeSoft murram, clay or hard rockRock needs breaking, so the rate per cubic metre rises
RockDepth and extent of the rockAdds a breaking rate and usually a separate drilling line
Site accessRoad surface, gate width, slopeDecides the plant that can reach the site and the mobilisation cost
Haul distanceWhere the spoil goesEach extra kilometre adds a tipper trip
EmbankmentWhether fill is needed, and how far it movesAdds selection, placement and compaction
Spoil disposalWhere the surplus is tippedAdds tipping charges, or a stockpile area on site
Working seasonDry season against the long rainsWet ground slows the plant and weakens the fill
CompactionSpecified density and test resultsAdds roller hours and field test samples
Survey and setting outWhether a design already existsDesign and setting out are a separate professional line
LiningSurface area to be linedA separate material and fitting contract

The drivers a contractor prices from, and what each one changes on the invoice.

Excavation is normally the largest single line on the bill. After that come the embankment, the spoil haul and the plant standing on site while the work runs.

Then check what the rate measures. Bank measure is the soil in the ground. Loose measure is the soil after it is broken out. Bank soil swells by about a quarter, so a rate quoted per loose cubic metre does not match a take-off done in the bank. They are two different numbers for the same hole.

Next, ask how rock is priced. A rate that assumes no rock is not a rate for a site with rock. The difference appears as a variation once the bucket hits stone. Therefore breakage belongs on the quotation as its own line.

Also, ask what the mobilisation fee covers. The last stretch of the road decides whether the machine arrives on one low-loader. Or it arrives on a chain of smaller vehicles, which costs more than the dig itself.

Finally, check whether compaction sits inside the excavation rate. Fill that is placed and not compacted is fill that settles later. The owner pays for that settlement in a pond that no longer holds water.

A Worked Dam Excavation Cost Example

A take-off beats a guess.

Take the 20 by 30 metre basin from the table above. Here is everything that has to be measured before the price is worked out.

ItemQuantityUnitWho prices it
Topsoil strip, 150 millimetres deep90cubic metresExcavation contractor
Bulk excavation, measured in bank1,664cubic metresExcavation contractor
Spoil to move, measured loose2,080cubic metresExcavation contractor
Embankment fill, compacted660cubic metresExcavation contractor
Basin floor to prepare600square metresExcavation contractor
Liner surface, floor and slopes1,050square metresLiner supplier
Anchor trench round the rim132metresLiner crew

The take-off for a 20 by 30 metre basin, 2 metres deep, with side slopes of one vertical to two horizontal.

Two of those lines carry a published price. The liner is one of them. At the 0.75 millimetre gauge the shop prices the sheet at KSh 340 per square metre. So 1,050 square metres of liner is about KSh 357,000 in material alone. The full list of gauges is on our dam liner prices page.

The excavation lines carry no published rate, and that is deliberate. A cubic metre rate on soft murram is not the same rate as one on rock. Therefore ask for the rate in writing, against the material the site actually has.

Then ask what each rate covers. Typical lines are the excavation rate per cubic metre in bank. Then the compaction rate per cubic metre of fill, and the mobilisation fee. Also the daily rate for plant standing on site when the ground is too wet to work.

A quotation that lists quantities is a quotation you can compare. Two quotations with the same take-off can still differ by a third. That third is the rate, so compare the rate and the scope, and not only the total.

Soil, Rock and Water: What Dam Excavation Cannot Fix

Ground decides what the dig can become.

A basin in heavy clay behaves differently from one in loose sand. The clay holds water when it is compacted, and it cracks when it dries out. The sand lets the water go straight through the floor.

GroundWhat it doesHow the work changes
Heavy claySeals well when compacted, then cracks in dry weatherCompact in layers, water the fill, and line the basin
Sandy or loamy soilSeeps, and the floor sloughs while it is dugLine the basin, or build a clay blanket on the floor
Murram with gravelCompacts well, but the stones puncture a linerPick out the stones and lay a geotextile underlay
Rock at the baseSlow to break, and the broken rock leaves a rough floorBreak and bench the rock, then prepare the floor
Water table inside the digThe hole fills as fast as it is dugPump it out, and compact only once the floor is dry
Organic or peaty soilNo bearing, no compaction and no sealStrip it and keep it off the basin floor

How the ground under the basin changes the method of dam excavation.

Rock changes the method, not the outcome. Broken rock makes a sound embankment and a stable floor. However, it has to be benched and shaped before the liner goes down.

Water is the one problem the dig cannot solve. A high water table fills the hole as fast as it is dug. Then the floor will not compact, and a liner laid on wet ground is a liner laid on a soft one.

None of this is fixed by a bigger machine. It is fixed by choosing the right site, or by changing the design to suit the site.

Spoil, Embankments and Where the Soil Goes

Every cubic metre dug has to land somewhere.

For the 1,664 cubic metre basin, that is about 2,080 cubic metres of loose spoil.

The embankments take part of it. Take an embankment 30 metres long and 2 metres high. With a 3 metre crest and slopes of one vertical to two horizontal, the cross section is 11 square metres. That is 330 cubic metres of compacted fill per side. So both sides need about 660 cubic metres. The remaining 1,420 cubic metres of loose spoil has no job on the farm.

Where the spoil goesWhat it costsThe risk
Embankment fillSelection, haul, placement and compactionThe wrong soil in the core leaks
Stockpile on siteNo haulage, but it takes up landA mound beside the dam ponds water and settles
Tip off siteHaulage by the cubic metreDistance drives the cost, and it moves every trip
Reuse on the farmFills roads, ponds or building padsOnly clean, non-organic material will do

Four homes for excavated spoil, and what each one costs or risks.

In practice, stockpiling on site is the cheapest option and the most dangerous one. A mound beside the dam ponds water against the embankment. In practice, spoil belongs well away from the dam, never against the upstream face.

Fill quality matters more than fill volume. Clay and silt cannot form a stable core, and they crack as they dry. Rocky material and well graded gravel compact best. Also, the embankment has to be keyed into the ground, not set on top of it.

Dam Excavation and the Approvals That Come First

Approvals come before the machine, not after it.

The Water Act 2016 sits under every water works in the country. The Water Resources Authority runs the authorisation and technical review for those works.

Then there is the environment. NEMA requires an impact assessment for projects that meet the threshold. A dam near a wetland, a river or a protected area often meets it. Published reports sit on the NEMA impact assessment reports page.

Kenya’s water harvesting and storage regulations add their own requirements. They ask for a dam design report before construction, and they ask for a registered contractor to run the work. The national water harvesting and storage procedures also set the stages, covering setting out, site clearance, inspection and handover.

A small farm pan may fall outside most of these. A large storage dam on a river catchment rarely does. Therefore settle the approvals before the spoil is moved, because the answer can change the design.

What is neededFrom whomWhen
Water works authorisationWater Resources AuthorityBefore construction
Dam design reportThe designer on the surveyBefore construction, for regulated storage dams
Impact assessmentNEMA, through an appointed expertBefore construction, where the project triggers it
Registered contractorThe contractor doing the workBefore the site is handed over
Topographical surveyA surveyorBefore the design and the setting out

The approvals and documents a dam project needs, and where each one sits in the sequence.

Dam Excavation Step by Step

Dam excavation is the part of the job the farmer watches, and the part that decides the rest.

The sequence below is the one Kenya’s water harvesting and storage procedures describe, trimmed to the ground work itself.

Step 1: Assess the Site

Size the storage against a poor rainfall year, not an average one.

Check the catchment, the soil, the water table and the road access.

Also check whether the approvals for the project are open.

Step 2: Survey and Set Out

Survey the ground and mark the basin on the pegs.

The pegs carry the design footprint, the excavation limits, the embankment line and the spillway position.

Dam excavation starts here, and a wrong setting out is wrong for the whole job.

Step 3: Clear and Strip

First remove vegetation, obstructions and unsuitable material.

Topsoil goes into its own stockpile, away from the basin floor.

In practice, that topsoil is worth keeping for the seedbed on the farm.

Step 4: Dig the Basin

Cut the basin in lifts so the floor stays even.

The bucket works from the top down, and the machine does not reverse over the finished floor.

Then the volume is checked against the take-off before the slopes are cut.

Step 5: Cut the Slopes

Cut the sides to the designed batter, one vertical to two horizontal for a simple basin.

Rock has to be broken and benched into the same slope.

A slope that stands is the one that keeps the liner and the embankment above it.

Step 6: Prepare and Compact the Floor

Then trim the floor flat and roll it.

Also pick out the stones and roots that would puncture the liner.

The floor will not hold water if it is soft, and compaction is what makes it firm.

Step 7: Build the Embankment

Place the fill in layers of 200 to 300 millimetres.

Each layer is compacted before the next one goes down.

The embankment is keyed into the ground, not set on top of it.

Finally, the crest is levelled and the fill is left to settle before the first fill of water.

Step 8: Move the Spoil and Hand Over

Then move the surplus spoil, tip it, or keep it for farm works.

Level the basin floor one last time and hand it over for lining.

A signed handover with the as-built depth and volume is what protects the next contractor.

Dam or Water Pan: Which One Needs Dam Excavation

The two words get used together, and they differ.

A water pan is a depression dug to catch runoff.

A dam adds an embankment and the structures that control the water.

Also a dam usually carries a spillway, because a stored reservoir has to let water go.

FeatureWater panEmbankment dam
StorageUsually under 500 cubic metresHundreds to thousands of cubic metres
StructureAn excavated basin onlyAn excavated basin plus a compacted embankment
SpillwayOften a simple overflow, sometimes noneA designed spillway sized for the catchment
Best forSmallholder irrigation, livestock, kitchen gardensIrrigation, livestock and commercial horticulture
Cost driverThe volume of soil movedThe soil moved, plus fill, compaction and the spillway
ApprovalsOften minimalAuthorisation and a design report usually required

Where a water pan ends and an embankment dam begins.

Typically a pan suits a small catchment and a short dry season.

A dam suits a bigger catchment, a longer dry season and a larger storage target.

Therefore the choice is a storage decision, and it comes before the machine.

Our ponds and dam construction page covers the wider build.

Dam Excavation, Lining and the Farm Water System

The dig starts the water system.

A lined basin holds what it is given, and it loses very little to the ground.

The liner is chosen by the ground, the size of the dam and the life the owner needs from it.

For a smooth clay basin, the 0.5 millimetre sheet is enough.

For murram with stones, the 0.75 millimetre sheet carries a farm dam.

For rock, the 1.0 millimetre sheet plus a geotextile underlay is the pairing.

Lined farm dam holding water after excavation, with the HDPE liner fixed to the cut slopes and a post-and-wire fence around the rim
A lined basin after excavation and lining, with the water standing in it.

The dam liner in the shop carries the gauges, and the dam liner anchor trench page covers the rim.

Then the stored water has to reach the crop.

A solar pump lifts it into an elevated tank, and the tank feeds the drip lines.

Our solar irrigation page covers the pumping side, and irrigation in Kenya covers the distribution.

StageWhat it does
Dam excavationCreates the storage
Liner and underlayStops the water leaving through the floor
SpillwayTakes the overflow away safely
Outlet and pipeworkMoves the water to the field
Solar pump and tankLifts and holds the water
Drip or sprinkler linesDeliver the water to the plants

The stages between an excavated basin and water standing in a field.

How to Get a Dam Excavation Quotation That Holds

Six questions settle most of it.

First, what is the volume in bank, and is the rate in bank or in loose measure?

Second, what does the rate cover, and what does it leave out?

Third, is rock priced, and how is breakage handled?

Fourth, what is the mobilisation fee, and what does it cover?

Fifth, is compaction inside the excavation rate?

Sixth, is the liner included, and if it is not, what surface area was used?

Also ask for the daily rate for plant standing idle in the wet, and for the payment schedule.

Then ask for the take-off in writing, with the quantities and the rates side by side.

Two quotations with the same take-off can still differ by a third. Therefore the rate decides which one is cheaper.

Hold every quotation in writing, so the scope, the quantities and the rate stay on the record.

Frequently Asked Questions

These are the questions we are asked most on dam excavation sites.

How much does dam excavation cost per cubic metre in Kenya?

The rate depends on the ground, the access and the haul distance, so there is no single published figure.

Dam excavation is priced per cubic metre in bank, and the same rate does not cover soft murram and rock.

How deep should a farm dam be?

One acre of maize at 5 millimetres a day needs about 20 cubic metres.

A 2 metre basin in a 20 by 30 metre footprint holds roughly 80 days of that.

Do I need a liner on a clay site?

Heavy clay holds water when it is compacted, so a small pan on clay can be left unlined.

However, the clay cracks as it dries.

A lined basin is the safer choice for storage that has to last through a dry season.

How long does dam excavation take?

A 1,664 cubic metre basin takes a few days of machine time with a crawler excavator.

Mobilisation, the weather and the rock decide the rest.

Plan for the dig to be the shortest part of the job.

Who can build a farm dam in Kenya?

For a regulated storage dam, the work is done by a registered contractor.

Then the design report and the authorisation have to be in place before the first bucket.

What is the difference between a dam and a water pan?

A water pan is a dug depression that catches runoff.

A dam adds an embankment, a spillway and the outlet structures that control the stored water.

Can I excavate a dam by tractor?

Yes, up to about 500 cubic metres on soft ground.

Above that, a tractor cannot cut a deep slope or compact fill to the specification.

In practice, the machine is chosen by the volume, the ground and the access.

What should I do before I start digging?

Settle the storage target, the survey, the approvals and the spoil plan.

Then set out the basin and start with the topsoil strip.