Uncategorized

Test pumping steps: An 8-Step Borehole Field Guide

+254 728 163329 WhatsApp +254 724 775516

Test pumping steps begin before the pump starts. The team needs a borehole log, an agreed test rate, working measurement tools and a safe place for discharged water. Then it records the resting water level and pumps at a controlled rate. Next, it monitors drawdown and recovery. Finally, it writes a report to guide permanent pump selection.

This guide follows a motorised-pump borehole in Kenya. Our borehole drilling guide covers construction; here we focus on the field test and its records. A trained groundwater professional should set the rate, supervise the measurements and interpret the result. The Water Resources Authority lists a borehole pumping-test code of practice among its groundwater guidance.

Test pumping steps at a glance

Use this order: confirm the plan, prepare the site and record the static water level. Then run an optional step test and let the borehole recover. Next, set the constant rate, pump and log drawdown. Finally, stop, monitor recovery and hand over the report. The optional step test does not replace the constant-rate test.

For boreholes and wells that will use a motorised pump, regulation 54 of Kenya’s Water (Resources) Regulations, 2025 specifies at least 24 hours of continuous constant-rate pumping and at least 20 hours of recovery. Plan the crew and power supply for both periods. A short flow demonstration is not the same test.

Before starting: equipment and records

First, collect the borehole log, casing diameter, total depth, screen intervals, development record, water demand and earlier test sheets. Check approvals and site access with the project professional. Next, prepare a temporary pump, cable, rising main and power source. Add calibrated flow and water-level tools, a clock, field sheets and a power-failure plan. An observation borehole can be included if the design calls for one.

Agree the measurement datum before recording levels. For example, a level from the top of casing needs a correction before comparison with one from ground level. Also agree where the water will go. Discharge close to the borehole can seep back and distort the test. Runoff can damage paths or neighbouring plots.

1. Test pumping steps: confirm the test plan

First, state the decision the test must support. It may be a new permanent pump, an irrigation expansion or an investigation of falling output. The professional then chooses the proposed discharge rate and decides whether a step test is useful. Write down the pumping and recovery periods, observation points, reading intervals and interruption rules. Use a rate the pump can hold steadily; a nameplate maximum is not an operating plan.

For a farm, compare the proposed rate with the irrigation schedule and storage plan. For example, a 30 m³ daily demand does not itself set the test rate. Instead, use borehole and aquifer evidence. The result may require longer pumping hours, more storage or a smaller irrigated area.

2. Prepare the borehole, pump and discharge route

Next, confirm the borehole has been developed and is clear enough for testing. Lower the temporary pump to the depth set by the professional, keeping its intake above the bottom and clear of the screen arrangement. Secure the cable and rising main. Then test the flow meter, water-level probe and power supply. Place discharge where it will not re-enter the aquifer near the test borehole or flood the site.

Record the pump intake depth, discharge-point distance, meter identifier and power source. A brief equipment check can reveal a leaking hose, unstable generator or probe that catches on a casing joint before the formal clock starts. Do not count that check as part of the constant-rate test.

3. Measure the static water level

Measure the resting water level from the agreed datum before pumping. Record the date, time and whether nearby pumping may be affecting it. If the borehole was recently pumped or developed, give it time to recover before treating that reading as a baseline. Repeat the measurement to catch a reading or transcription error.

The baseline matters because drawdown is the change from the pre-pumping level. Use the same datum for every depth reading. For example, static level is 30 m below the casing mark. The level during pumping is 39 m below that mark. Therefore, drawdown at that time is 9 m. These numbers illustrate the calculation; they are not a tested Eunidrip borehole. Accurate test pumping steps preserve the datum with each reading.

4. Run an optional step-drawdown test

A step test runs the pump at successive flow rates while the team records water level and actual discharge at each stage. It helps show how the borehole responds as the rate rises and can inform the constant-rate choice. The number and duration of steps depend on the test plan; do not copy another site’s settings without checking the borehole.

Keep each rate steady and record the time of every change. If the level approaches the pump intake or discharge becomes unstable, stop. Then have the professional reassess the rate. The UK Environment Agency’s groundwater appraisal report describes the usual sequence of equipment, step, constant-discharge and recovery tests. It is technical guidance, not Kenyan law.

5. Allow recovery and set the constant rate

After a step test, let the water level recover for the planned baseline before the long test. Then set the target rate and check the pump, valve, meter and power. A varying rate makes drawdown harder to interpret. Record the actual start time and first flow measurement, not just crew arrival.

If no step test is performed, the professional still needs a justified constant-rate target from the borehole records and intended use. The target should leave room between the pumping water level and pump intake. When the water level drops too close to that intake, the test design needs review rather than an unrecorded valve adjustment.

6. Test pumping steps: pump and log drawdown

Run the motorised-pump borehole at the agreed constant discharge for at least 24 continuous hours under the 2025 regulation. First, record elapsed time, flow and water level frequently. Then follow the intervals in the test plan. Watch flow and power throughout. The US Geological Survey’s aquifer-test guidance stresses accurate timed readings and control of the pumping rate. These test pumping steps produce a usable drawdown curve.

For example, if flow falls while the pump remains on, record when it happened, the level at that moment and the likely cause. Do not quietly change the valve and draw a smooth line through the gap. The professional can decide whether the test remains usable or needs repeating. Also record rain, neighbouring pumping or generator stops that could affect the curve.

Test pumping steps: water flowing from a pipe in a field

7. Stop pumping and monitor recovery

At the planned stop time, record the final flow and water level. Then stop the pump and start the recovery clock. Keep taking readings as the borehole refills, with closer spacing early in recovery. For a motorised-pump borehole under regulation 54, monitor recovery for at least 20 hours. Preserve the full record even if the level appears to return earlier.

Do not pump the borehole during that period unless the professional formally ends or changes the test. A restart can make the recovery curve difficult to interpret. Record the level from the same datum used for the baseline. If the level does not recover as expected, document that result rather than rewriting the field sheet.

8. Test pumping steps: analyse and hand over the report

Finally, check the raw data for missing times, unit errors, flow changes and inconsistent level datums. Plot time against drawdown and recovery, then have the groundwater professional interpret the borehole’s response and recommend an operating yield with stated limits. Keep the step-test record, constant-rate sheet, recovery sheet, any observation-well data and the signed analysis together.

One useful check is specific capacity at a stated time: discharge divided by drawdown. With an illustrative 6 m³/h flow and 9 m drawdown, it is 0.67 m³/h per metre at that time. However, this number alone does not establish sustainable yield. Our solar pump sizing guide uses tested yield and pumping level with farm demand and pipe route. Our borehole solar installation guide covers later work.

Field log template for test pumping

Use a separate row for each measurement. These test pumping steps need a complete field log; the table shows column headings, not example readings. Agree units before the test and never mix litres per second with cubic metres per hour in one column without conversion.

Clock timeElapsed timeTest stageFlow (m³/h)Water level (m below datum)Drawdown or recovery (m)Event or observation
Record at siteFrom stage startBaseline, step, constant rate or recoveryMeasured or zero after stopMeasuredCalculate from baselinePower, weather, valve or other change

Keep the original field sheet and measurement datum with the final report.

Common test-pumping mistakes

The most damaging mistakes are a changing discharge rate, unlogged power interruption, discharge water flowing back toward the well, a shifting measurement datum and stopping the recovery record early. Another is treating a brief air-lift yield check as the full constant-rate test. Each can change the meaning of the numbers handed to a pump designer.

Keep water-quality testing separate. A pumping test shows how the source responds to withdrawal. Meanwhile, a laboratory test addresses suitability for the intended use. If irrigation is planned, consider salinity and treatment as well as flow. Test pumping steps support equipment selection only when the records are trustworthy.

Equipment to match after testing

We use the report to review a permanent pump for the Eunidrip system. The selected flow must respect the recommended borehole yield; the model’s pump curve must also cover total head at that flow. A shop listing cannot replace the field data.

Our shop itemResult needed for selection
Solar water pump setTested operating yield, pumping water level, delivery head, daily demand and power plan

Frequently asked questions about test pumping steps

What are the main test pumping steps? Plan the test, prepare equipment, measure the baseline, optionally run a step test, pump at a constant rate, log drawdown, monitor recovery and interpret the report.

Is a step-drawdown test compulsory? The cited 2025 regulation specifies a constant-rate test and recovery. A professional may add a step test to help choose and evaluate the rate.

How long does a borehole test take in Kenya? For a motorised-pump borehole under regulation 54, allow at least 24 hours of constant-rate pumping followed by at least 20 hours of recovery, plus setup, any step test and reporting.

What is drawdown? It is the difference between the resting water level and the level while pumping, measured from the same datum at a recorded time.

Can I choose a permanent pump from the peak test flow? Use the professional’s recommended operating yield and the pump curve at the required head. A brief peak flow is not enough.

Plan a borehole test with Eunidrip

Send us the borehole log, location, intended water demand and existing test records. We can review the test pumping steps and measurements needed for your irrigation or water-supply design. Then we use the final report to size the next stage. Keep the raw field sheets with the signed report so your equipment choice can be checked later.

Call Us WhatsApp